Triton, BOURBON, IN
CLIENT OBJECTIVES
Triton Schools needed upgrades and replacements throughout the elementary and Jr.- Sr. high school and bus barn. In the first project they wanted to include replacements and upgrades to the HVAC, gym lighting, temperature controls, and windows in the high school, which was built in 1967, and upgrade the gym lighting and the HVAC in the elementary school, which was built in 1987. In the second project, Triton Schools wanted to continue to upgrade the HVAC, gym lighting, temperature controls, windows, and re detection in the high school and upgrade temperature controls, HVAC, and re detection in the elementary school. For the third and final project, the boilers, hot water heater, and sump pump all need replacing in the high school.
VALUE DELIVERED
Project 1: Projected annual savings of $401,646.00 for 15 years, totaling $6,024,690.00.
Project 2: Projected annual savings of $314,884.00 for 15 years, totaling $4,723,260.00.
Project 3: Projected annual savings of $77,931.00 for 15 years, totaling $1,168,965.00.
Triton Schools is projected to save a total of $11,916,915.00 over 15 years.
PROJECT SOLUTIONS
ECS Midwest met all of Triton Schools’ objectives through the following services:
Project 1:
Triton Jr.-Sr. High School
• Classroom HVAC Replacement
• Industrial Arts HVAC Replacement
• Wrestling Room HVAC Replacement
• Gym Lighting Upgrade3
• Temperature Control Upgrade
• Cooler/Freezer Alarms
• Gym Locker Room Exhaust
• West Restroom Upgrades
• East Restroom Upgrades
• Gymnasium HVAC Upgrade
Triton Elementary School
• Domestic Water Heater Replacement
• Gym Lighting Upgrade
• Cooler/Freezer Alarms
• Cabinet Unit Heater & Radiation Actuator Replacement
Project 2:
Triton Jr.-Sr. High School
• Cafeteria HVAC Replacement
• Auditorium HVAC Replacement
• Music Room HVAC Replacement
• Chiller Replacement
• Gym Lighting Upgrade
• Temperature Control Upgrade
• Domestic Water Heater Replacement
• Fire Detection Upgrade
• Emergency Lights & Exit Signs
• Window Replacement
• Courtyard Window Wall Replacement
Triton Elementary School
• Boiler Burner Fuel/Air Ratio Controls
• Variable Air Volume Box Upgrade
• Energy Management System Upgrade & DDC System Re-commissioning
• Fire Detection Upgrade
Triton Bus Barn
• Ventilation System
Project 3:
Triton Jr.-Sr. High School
• Boiler & Hot Water Replacement
• Sump Pump Replacement
CLIENT BACKGROUND
For many years, Triton Schools has been an existing customer on the Temperature Control and Services side of Havel. Located in Bourbon, Indiana, Triton is a class 1A school corporation with 1,000 students in grades K-12.