Manchester, NORTH MANCHESTER, IN
CLIENT OBJECTIVES
Manchester Community Schools was seeking to do several upgrades at all four of their buildings. Manchester Jr.-Sr. High School needed a new chiller and temperature controls as well as air conditioning in the gym and locker rooms and new fire protection. Manchester Intermediate and Elementary Schools needed new fan-powered boxes to move air throughout the two buildings.
VALUE DELIVERED
Project 1: Jr.-Sr. High School
- Annual savings of $59,601.00 for 10 years totaling $596,010.00
Project 2: Jr.-Sr. High School
- Annual savings of $80,346.00 for 10 years totaling $803,460.00
Project 3: Intermediate School
- Annual savings of $106,478.00 for 10 years totaling $1,064,780.00
Project 4: Elementary School
- Annual savings of $132,464.00 for 10 years totaling $1,324,640.00
Overall projected 10-year savings: $3,788,890.00
PROJECT SOLUTIONS
To secure the energy savings sought by Manchester Community Schools, ECS Midwest replaced outdated HVAC equipment and installed energy efficient upgrades.
Project 1: Jr.-Sr. High School
- Ice Harvester System Replacement
- Heating Pump Control Upgrade/Variable Frequency Drives
- Boiler Control Upgrade
- Freezer/Cooler Control Upgrade
Project 2: Jr.-Sr. High School
- Gymnasium HVAC Upgrade
- Locker Room HVAC Upgrade
- Fire Protection System Installation
Project 3: Intermediate School
- Main Air Handling Unit Replacement
- Fan-Powered Variable Air Volume Box Replacement
Project 4: Elementary School
- Main Air Handling Unit Replacement
- Fan Powered Variable Air Volume Box Replacement
CLIENT BACKGROUND
Manchester Community Schools strives for a tradition of excellence through their mission statement, “Manchester Community Schools engages students in relevant activities that ensure students will learn to think critically at progressively higher levels.” Manchester Community Schools has been a customer with ECS Midwest for over 30 years—and counting.