ECS_MW_RGB_322k_400.png

What Can We Do For You?

260.487.7900

or contact us by email

facebook-30px.png  Youtube-30px.png  IN color.png  emcor_nation_30px (1).png

  • Home
  • About Us
    • Meet the Team
    • Safety and Quality
    • Sustainability
  • Services
    • Energy Solutions
    • Commissioning / Recommissioning
    • Building Operations Services
    • AMR & AMI
    • Water/Wastewater Treatment Plants
  • Case Studies
    • School Systems
    • Elementary Schools
    • Middle Schools
    • High Schools
    • Colleges / Universities
    • Public / Government
  • Contact
  • Careers
  • Shambaugh & Son

Liberty-Perry Community, SELMA, IN

CLIENT OBJECTIVES

The Liberty-Perry Community School Corporation was looking to replace lighting and develop ECMs at Wapahani High School that would reduce energy use and costs.

VALUE DELIVERED

ECS Midwest provided systems upgrades that will result in $230,891.00 in energy savings each year for 15 years for a total of $3,463,365.00. These savings will pay for the entire project with an additional savings of $1 million.

PROJECT SOLUTIONS

The first phase at Wapahani High School consisted of upgrading classroom HVAC systems with dual-temperature two-pipe vertical unit ventilators. The systems included two-pipe horizontal unit ventilators and four-pipe VUV units for temperature and humidity control. ECS Midwest installed two-pipe fan coil units to provide heating and air to the existing guidance office.

The kitchen and administrative office received an HVAC upgrade that included two DX cooling and hot water heating horizontal unit ventilators with two roof top condensing units. Boiler upgrades were made and consisted of one high-efficiency condensing boiler to utilize low temperature hot water to maximize boiler efficiencies.

A boiler management system panel was installed and tied into the new energy management system to allow for sequence boiler operations and to maximize boiler efficiencies.

The chiller was replaced with an air-cooled chiller with chilled water circulating pumps. Finally, temperature controls were changed for the central hot water/chilled water dual temperature system to a new BACnet BAS system, enhanced by web client software that will allow interface from the school’s intranet. A new energy sequence of operations will be used to operate the facility, including Optimum start/stop, night setback, holiday scheduling, occupancy control, demand ventilation control, and hot water/chilled water reset to operate the facility in the most efficient manner. ECS Midwest replaced metal halide light fixtures with T5 and T8 fluorescent fixtures in the gymnasium, with lighting control through the new energy management system.

The second phase of this project involved replacement of the dual temperature and four-pipe heating and cooling water distribution piping.

CLIENT BACKGROUND

Liberty-Perry Community Schools consists of Selma Elementary (Grades K-5), Selma Middle School (Grades 6-8), and Wapahani High School (Grades 9-12) and serves over 1,000 students.

EDUCATION
K-12 SCHOOLS


OPERATING COMPANY:
ECS Midwest

CLIENT:
Brownsburg Community
School Corporation

PROJECT DURATION:
April 2011 – August 2012

CONTRACT AMOUNT:
$1,281,514.00


cs_value.gif



Design/Build
Bid Build
New Construction
Retrofit/Renovation
Electrical Construction
Mechanical Construction
Facilities Services
Consulting Services
Fire Protection

Case Studies

  • School Systems
    • Adams
    • Batesville
    • Bluffton-Harrison
    • Brownsburg
    • Central Noble
    • Cloverdale
    • Cowan
    • Danville
    • Duneland
    • East Allen
    • Eastern Howard
    • Flat Rock-Hawcreek
    • Fremont Chiller Project
    • Fremont Community Schools
    • Garrett-Keyser-Butler
    • Garrett-Keyser-Butler
    • Liberty-Perry
    • Manchester
    • Mill Creek
    • Monroe Central
    • North Newton
    • Plymouth
    • Mishawaka
    • Shelbyville
    • South Central
    • South Dearborn
    • Taylor
    • Tri-Central
    • Triton
    • Triton
    • Union Township
    • Wabash
  • Elementary Schools
    • Bridgepoint
    • Central Noble
    • Central Noble
    • Christ The King
    • Garrett-Keyser-Butler
    • Garrett-Keyser-Butler
    • Greensburg
    • John Simatovich
    • Lake Ridge
    • Manchester
    • Parkwood
    • Porter Township
    • Southeast Fountain
  • Middle Schools
    • Bluffton
  • High Schools
    • Fountain Central
    • Greensburg
    • Lake Ridge
    • Metropolitan
    • North Daviess
  • Colleges / Universities
    • Glen Oaks
    • Notre Dame
    • Western Michigan
  • Public / Government
    • Blackford County
    • Citilink
    • City of Lafayette
    • City of Marion
    • Henry County
    • Jasper County
    • Whitley County Jail
    • South Chicago Heights
 

EMCOR Construction Services Midwest

  • About Us
  • Services
  • Case Studies
  • Contact

Shambaugh & Son, L.P.
Divisions

  • ASG
  • Dalmatian Fire
  • ECS Midwest
  • EMCOR Services Shambaugh
  • Harroun Fire Protection
  • Havel
  • Northstar Fire Protection of Texas
  • Precision Controls
  • Progressive Pipe Fabricators

EMCOR Group, Inc.

  • About Us
  • Locations
  • Investor Relations
  • Sustainability Efforts
©2023 EMCOR Group Inc.

Privacy Notice  |  CCPA Notice at Collection  |  Sitemap

NYSE: EME